The station was opened on 11 August 1978 as part of the second section of the first Kharkiv Metro line, running from Moskovskyi Prospekt (now Turboatom) to Proletarska (now Industrialna) and comprising five stations. Unlike the stations of the first section, those built during this phase feature bolder and more varied architectural designs. The primary purpose of the extension was to connect the city’s major industrial enterprises with the city centre. The opening of the station coincided with the 60th anniversary of the Komsomol.
Description
Armiiska is a shallow single-vault station constructed of monolithic reinforced concrete using sliding formwork and follows the standard Kharkiv single-vault design. The station’s design is inextricably linked to the theme of Kharkiv’s liberation from the Nazi invaders.

Despite its restrained architectural style, the station has a striking appearance and several distinctive design features.

The first thing visitors notice is the vault, whose surface is covered with diagonal ribs that visually divide it into square sections.

The track walls are clad in polished reddish-brown granite.

The track walls feature numerous shield-shaped brass inserts. Since August 2023, they have displayed cast emblems of the Ukrainian coat of arms and the coat of arms of Kharkiv.

Behind the shields are side-mounted fluorescent lamps, which often malfunctioned because of vibrations caused by passing trains.

Originally, the shields bore five-pointed stars. There were thirty along each track wall, for a total of sixty—symbolizing the 60th anniversary of the Soviet Army, celebrated in the year the station opened.

The station was named in honor of the ten military divisions awarded the honorary title “Kharkiv” for their role in liberating the city from Nazi occupation in August 1943.

The station floor is paved with red granite interspersed with small areas of black labradorite. The white safety line has a trapezoidal pattern that complements the station’s overall design. The platform edges are finished in light gray granite.

Another distinctive feature of the station is its ten original floor-mounted light fixtures arranged along the center of the platform, vaguely resembling Olympic cauldrons.

Each fixture consists of a polished brass bowl 1.5 meters in diameter mounted on a profiled aluminum pedestal.

Mounted above each floor fixture is a custom-made luminaire consisting of three concentric rings of different diameters. Fluorescent lamps arranged around the rings cast light upward onto the vault, creating the impression of an eternal flame. Despite this innovative lighting concept—with both side-mounted and floor-mounted lighting—the station remained rather dim until the original lamps were replaced with LEDs.

The stair railings and vestibule walls are clad in light yellow marble.

The vestibules feature cast aluminum decorative panels that reinforce the station’s military theme.

The station in the 2000s.


Original station name and track-wall signage.

The station during its first days of operation.

The station in its early years of operation.

The original mechanical interval clock, replaced by an electronic display in the early 1980s.

The station in 1980.

Construction and projects
The station was built using the open-pit method. The design of the shallow, single-vault station was developed by the Kharkivmetroproekt Institute. The design proved highly successful, became known as the “Kharkiv Single-Vault,” and was later adopted for dozens of metro stations across the former Soviet Union.
The station was constructed of monolithic reinforced concrete using wide, self-supporting reinforcement cages. The vault was cast using mobile steel formwork that advanced along rails with the aid of hydraulic jacks. As with the other stations on the second launch section, all approach tunnels were driven beneath Moskovskyi Prospekt (now Heroiv Kharkova Avenue) using underground mining methods.
Compared with the stations of the first launch section, the Kharkiv Single-Vault design underwent several important improvements. Instead of a flat concrete slab, the platform foundation was built as a reinforced-concrete trough in the form of an inverted vault. This design could withstand significantly higher groundwater pressure. Under the revised construction sequence, the platform and trough structure were completed first, followed by the station vault. Brickwork was largely replaced with precast reinforced concrete panels. To speed up the concreting of the vault, the formwork was fitted with a second insulated skin, with electric heaters installed between the two layers.
The soft clay soils in this area made it possible to use a mechanized tunnel boring shield. Also, during the construction of the Radyanskoi Armii station, a new method for securing the tubing rings was used for the first time, reducing both construction time and costs. As a result, all major work at the station, including the construction of structures and tunnels, was completed in less than two years, and tunnel driving progressed at an impressive rate of 100–200 meters per month.
A similar incident occurred during construction of the Industrialna–Radyanskoi Armii section, when a tunnel boring machine struck a water main that had not been shown on the construction drawings. Water immediately began flooding the completed tunnel. Thanks to the quick and decisive actions of the tunneling crews, the situation was brought under control, and tunneling resumed only a few days later.
The excavation pit of Radyanskoi Armii station.

Delivery of construction materials and removal of excavated soil by dump trucks.

Preparations for the construction of the station structures. The photograph shows horizontal struts supporting the excavation walls.

The approach tunnels as they enter the future station.

The foundation is nearing completion.

Unloading concrete from dump trucks.

Plasterers at work in the station excavation.

Metro builders celebrate the 34th tunnel breakthrough on the Radyanskoi Armii–Komsomolska section—the final breakthrough on the first metro line. 4 February 1978.

The station in January 1978. Preparations are underway to clad the stairs and install marble railings.

The completed structural shell of the station.

The station six months before opening.

The station four months before opening.

Laying granite paving on the station platform.

Electricians test the operation of the station’s floor-mounted light fixtures.

The station a month before opening.

A test train at Radyanskoi Armii station, 20 July 1978.

The station in the last days before opening.

The approved concept design.